Home > Supplier Companies > FKC-Lake Shore > Articles > Drill & Blast Tunneling
FKC-Lake Shore

Drill & Blast Tunneling

Jun 24, 2020
 
At Frontier-Kemper we are skilled at conventional Drill-and-Blast excavation as well as the Shotcrete Method (also known as the Sequential Excavation Method or New Austrian Tunneling Method)
 
Highway tunnels are often large in cross-section and require conventional Drill-and-Blast excavation methods. Frontier-Kemper led the joint venture projects on the Hanging Lake Tunnels on I-70 in Glenwood Springs, CO, the Haiku Approach & Tunnels on Hawaii's H3, and the Silver Cliff Tunnels on the shore of Lake Superior in Wisconsin.
 
 

Source: https://www.frontierkemper.com/civil/drillandblast.html

Magazine
No information