Northern Mat & Bridge
Rig Matting
• NMB's feature Rig Mat
• 8' x 40', 6" thick, 3 and 4 beam steel framed rig mat
• Includes side beam shackles for easy lifting and placing.
• Excellent for drilling and service rig applications, pipeline construction, tank farms, pipeline crossings and much more.
• Other sizes stocked include 8' x 20' and 8' x 30', but NMB can build rig mats to whatever size and dimensions you may require.
Steel Framed Rig Mat Pamphlet
![](https://mininglifeonline.net/images/upload/2014/04/27/7bSAQgb_f3ccdd27d2000e3f9255a7e3e2c48800.jpg)
![](https://mininglifeonline.net/images/upload/2014/04/27/5hjCAyi_156005c5baf40ff51a327f1c34f2975b.jpg)
![](https://mininglifeonline.net/images/upload/2014/04/27/p4wf5Ar_799bad5a3b514f096e69bbc4a7896cd9.jpg)
![](https://mininglifeonline.net/images/upload/2014/04/27/D2Z2JdL_1bc3aee8ca2525eb9995e6590e76b1dd.jpg)
![](https://mininglifeonline.net/images/upload/2014/04/27/7bSAQgb_f3ccdd27d2000e3f9255a7e3e2c48800.jpg)
![](https://mininglifeonline.net/images/upload/2014/04/27/5hjCAyi_156005c5baf40ff51a327f1c34f2975b.jpg)
![](https://mininglifeonline.net/images/upload/2014/04/27/p4wf5Ar_799bad5a3b514f096e69bbc4a7896cd9.jpg)
Source: http://www.northernmat.ca/Matting/rig-matting
Red Seal Heavy Equipment Technician (Shop & Field work)
Reporting to the Shop Manager, the Heavy Equipment Technician is responsible for providing the maintenance and services needs of all Northern Mat & Bridge equipment.
Mat Plant Labourer
Reporting to the Plant Manager & Plant Supervisor, the Mat Plant Labourer is responsible for the production in their area of the mat plant facility.
Shuttle Operator – DZ License Required
Reporting to the Field Supervisor, the Shuttle Operator provides support in the field with a shuttle vehicle.
Field Supervisor
Reporting to the General Superintendent, the Field Supervisor leads and provides support in the field to assigned projects.