Bending Lake Iron Group Ltd.
Mining Sequence
Behre Dolbear in their “Independent Evaluation of the Bending Lake Property, Ontario, Canada” confirmed:
• A new mine life of 35 years of production.
• Open Pit of 2000m long by 800m wide to a depth 245m.
• Total Production Values of 245 Mt of ore @ 25.08% Fe and 140 Mt of waste.
• Producing 7 Mt ore and 4 Mt waste annually.
• Producing approximately 61.5 Mt of Fe concentrate of 1.75 Mt annually.
Source: http://www.bendinglakeiron.com/Mining%20Sequence.htm