Western Alberta Transmission Line Project Profile
 
Location: Southern Alberta
Scope: Provide access for concrete trucks and equipment through various seasons
Mission: The customer needed 24 hour access to tower sites and right of way to continue building transmission lines.
 
Results: From west of Edmonton to east of Calgary, Northern Mat & Bridge (NMB) provided multiple crews that were working with access points to the right of way. NMB installed pads for the lay down of work space, provided access for the concrete trucks, screw pile excavators, and with the services provided, client work crews were able to access tower sites and continue their progress. This job has been the largest and longest project to date for NMB.
 
 
Weyburn Saskatchewan
 
Location: Southern Saskatchewan
Scope: Create access for cranes and equipment to get to site
Mission: Build access roads through noxious weeds and muddy terrain
 
Results: In the Weyburn-Estevan SK area, Northern Mat & Bridge leapfrogged mats to gain access to the right of way and built pads for cranes and lines stringing equipment. Mats for wash areas and structures access were provided over wet and muddy terrain. The access solutions provided also prevented the transfer of noxious weeds to non-affected areas. The mats that had been exposed to noxious weeds were pressure washed/steam cleaned to prevent the transfer of spores thus maintaining environmental integrity.
 
 
Southern Saskatchewan Powerline
 
Location: Southern Saskatchewan 
Scope: Create access from the main road to site in muddy conditions
Mission: Lay access mats to protect the land with minimal disturbance.
 
Results: Northern Mat & Bridge provided 4,700 access mats for a power line project in Southern Saskatchewan. 14” of rain made completing the project difficult, Northern Mat & Bridge laid mats to protect the pasture land and give crews access to site without disrupting the integrity of the land.
 
 
Northwest Sturgeon Refinery Facility Project
 
Location: Southern Alberta
Scope: Build temporary access roads to reach transmission lines
Mission: Provide rig mats to build access roads and temporary pads so the customer can rebuild transmission lines
 
Results: Northern Mat & Bridge have been awarded the contract to provide Access and RIG Mats for the Northwest Sturgeon Refinery Facility Project which involves rebuilding and realigning transmission lines around the east side of the Northwest Sturgeon Refinery site to allow improved access to the refinery.
 
 

Source: https://northernmat.ca/markets/power-transmission-distribution/

Red Seal Heavy Equipment Technician (Shop & Field work)

Reporting to the Shop Manager, the Heavy Equipment Technician is responsible for providing the maintenance and services needs of all Northern Mat & Bridge equipment. 

Mat Plant Labourer

Reporting to the Plant Manager & Plant Supervisor, the Mat Plant Labourer is responsible for the production in their area of the mat plant facility.

Shuttle Operator – DZ License Required

Reporting to the Field Supervisor, the Shuttle Operator provides support in the field with a shuttle vehicle.

Field Supervisor

Reporting to the General Superintendent, the Field Supervisor leads and provides support in the field to assigned projects.