3L2R Inc.
Projects
Switchgear Retrofit
Used existing cell structure and incoming cables at site and re-worked the bus connections to a newer style interior replacement with updated feeder circuits with future options to upgrade and expand circuits within the facility.
Transformer Untanking Inspection
Full internal detailed inspection of a liquid filled transformer to determine problems, possible cause of failures and repairs.
Transformer Bushing Re-Gasket
Replaced gasketing material on liquid filled transformer bushings to prevent dielectric fluid leakage, this will prevent premature failure of the unit in operation and maintain environment standards.
ATS Integration
Installing an automatic transfer switch in to a new standard free issued distribution board to allow the hook up of a generator as back up power in the event of hydro loss.
ATS Integration - Custom Bus Work
Custom bus work to allow the number of cables per phase and entry point from the generator side and allowing for the potential of more than one or two sources of power.
6000A Co-gen Switchboard
Breaker Retro-Fit Upgrade
Used existing cell structure at site and re-worked the bus connections to a newer sytle cubicle replacment that allow for SCADA and remote operations provisions along with an updated solid state smart relay.
New Switchgear or Section Integration with Existing line-up
Failure Investigation of Oiled Filled Transformer
Failure investigation of an oil filled transformer and determine potential cause(s). Projects like these can lead to repair and/or rewind opportunities if viable.
Custom Manual Transfer Switch
Oil Filled Transformer Rad Replacment
On site replacement for primary service oil filled transformers, some require custom modification. Depending on available material and time requirements.
E House Construction
Transformer Bushing Replacement
Low Voltage and High Voltage bushing replacement.
Transformer Rewind
Full three phase rewind on an oiled filled transformer.
Source: https://www.3l2r.com/Projects.htm