Machines Roger International

Recent Achievements

Oct 22, 2013

• XStrata – Kidd Creek Mine Timmins, ON
     ○ Paste fill hole, ITH production drilling, V-30 blind boring, service hole drilling, cable bolt drilling, raise boring

 

• XStrata – Persévérance Mine Matagami, QC
     ○ ITH production drilling, cable bolt drilling, V-30 blind boring and down reaming, service hole drilling

 

• XStrata – Brunswick Mine Bathurst, NB
     ○ ITH production drilling, V-30 blind boring

 

• XStrata – Craig Mine Sudbury, ON
     ○ ITH production drilling, V-30 blind boring

 

• XStrata – Fraser Mine Sudbury, ON
     ○ ITH production drilling, V-30 blind boring

 

• Agnico Eagle – Laronde Mine Cadillac, QC
     ○ ITH production drilling, service hole drilling

 

• Agnico Eagle – Goldex Mine Vald’Or, QC
     ○ ITH production drilling, V-30 down reaming

 

• Agnico Eagle – Lapa Mine Cadillac, QC
     ○ ITH production drilling, V-30 blind boring, down reaming and conventional pulling, service hole drilling

 

• Iam gold – Niobec Mine St-Honoré, QC
     ○ V-30 down reaming and conventional pulling, paste fill hole drilling

 

• Vale Inco – Coleman Mine Sudbury, QC
     ○ ITH production drilling, V-30 blind boring

 

• Richmont – Beaufort Mine Vald’Or, QC
     ○ Drill buggy long hole drilling

 

• Richmont – Island Gold Mine Dubreuilville, ON
     ○ Drill buggy long hole drilling and inverse slot raise development

 

• Aurizon – Casa Berardi Mine Lasarre, QC
     ○ V-30 blind boring and down reaming

 

• Ressources Alexis – Lac Herbin Mine Vald’Or. QC
     ○ V-30 blind boring and down reaming

 

• Cementation – Nickel Rim Project Sudbury, ON
     ○ V-30 blind boring

 

• GoldCorp – Musselwhite Mine Pickle Lake, ON
     ○ ITH production drilling, V-30 blind boring and down reaming


Source: http://www.machines-roger.ca/recent_achievements.ws

LONGHOLE DRILLER HELPER (VARIABLE WORK SCHEDULE AND LOCATION)
  • Assist the driller in operating a Cubex drilling rig.
  • Perform maintenance work on the drilling rig.
DIAMOND DRILLER HELPER (LARONDE, 5-2-4-3 SCHEDULE)
  • Assist the driller in operating a diamond drilling rig.
  • Perform maintenance work on the drilling rig.
DIAMOND DRILLER (LARONDE, 5-2-4-3 SCHEDULE)
  • Operate a diamond drilling rig.
  • Perform maintenance work on the drilling rig.
DIAMOND DRILLER HELPER (WESTWOOD, 4-3 SCHEDULE)
  • Assist the driller in operating a diamond drilling rig.
  • Perform maintenance work on the drilling rig.