Timmins West Mine (Operating Mine)

Timmins West Mine is located 18 kilometres west of Timmins, Ontario, host to one of the world’s most prolific gold camps. The Mine includes two deposits, the Timmins Deposit and Thunder Creek Deposit, which are approximately 800 metres apart and are connected by two drifts. Ore from the Mine is trucked approximately 42 kilometres to the Bell Creek Mill for processing (see Bell Creek Mill section). Timmins West Mine was in commercial production as of January 1, 2012.
Quarterly Production

(1) Grams per tonne
Probable Reserves

(1) Grams per tonne
Resources(1)

(2) Grams per tonne
Technical Reports


Source: http://www.lsgold.com/Mines-Projects-Properties/Review-of-Properties/Timmins-West-complex/Timmins-West-Mine-Operating-Mine/default.aspx
![]() |
In this role, you will work with the operations team to consolidate the annual budget, accounting process and preparing short term forecasts.
The role of the IT System Administrator will be responsible for assisting staff with technical support of desktop computers, applications, networks, and related technologies.
In this position, you will be responsible for supervising all mine engineering staff and managing all mine functions at the Timmins West Mine to maximize the operation’s performance in a safe manner.
The role of the Geotechnical Engineer will be to work closely with the engineering and operational teams on site to provide and implement sound engineering and rock mechanics principles that will ensure stability of stopes and excavations with minimal dilution and ground failure.