Pan American Silver Corp.

Timmins

May 15, 2020
MINING & PROCESSING
MINE TYPE: Underground
AVERAGE PLANT THROUGHPUT: 4,400 TPD
The gold mineralization at Bell Creek mine is mined using underground longhole mining methods. At the Timmins West mine, primary mining methods include longitudinal and transverse longhole mining. Ore from both mines is processed at the Bell Creek mill via single-stage crushing and single-stage grinding, with a portion of the gold recovered by gravity methods, followed by pre-oxidation and cyanidation with carbon-in-leach and carbon-in-pulp recovery.

 

GEOLOGY & MINERALIZATION
RESERVES: 988 koz Au
Gold mineralization in the Bell Creek mine occurs in steeply-dipping, shear-hosted sulphide mineralization zones. Gold mineralization in the Timmins West mine occurs in steeply-plunging mineralized zones that occur within or along favourable lithostructural settings.

 

 


Source: https://www.panamericansilver.com/operations/north-and-central-america/timmins/

Senior Cost Accountant

In this role, you will work with the operations team to consolidate the annual budget, accounting process and preparing short term forecasts.

IT System Administrator

The role of the IT System Administrator will be responsible for assisting staff with technical support of desktop computers, applications, networks, and related technologies.

Chief Mine Engineer

In this position, you will be responsible for supervising all mine engineering staff and managing all mine functions at the Timmins West Mine to maximize the operation’s performance in a safe manner. 

Geotechnical Engineer

The role of the Geotechnical Engineer will be to work closely with the engineering and operational teams on site to provide and implement sound engineering and rock mechanics principles that will ensure stability of stopes and excavations with minimal dilution and ground failure.