New Gold Provides New Afton Exploration Update
- Underground exploration drilling on the AI West target, located approximately 500 meters west of the B3 block cave reserve, returned 25.2 g/t gold over 2 metres; 0.39 g/t gold and 0.19% copper over 16 metres; 0.34 g/t gold and 0.18% copper over 34 metres; 0.97 g/t gold and 1.27% copper over 8 metres; 0.36 g/t gold and 0.19% copper over 16 metres; 2.72 g/t gold and 0.25% copper over 4 metres and 3.35 g/t gold and 0.64% copper over 6 metres (see Table 2 for full drilling results).
- Surface exploration drilling on the Cherry Creek trend returned 21 g/t gold over 1 metre (see Table 4 for full drilling results).
These targets are identified as AI West, AI Southeast and AI North, based upon their location relative to the main New Afton ore body (Figure 1).
- Hole EA21-289 returned 6 metres at 1.06 g/t gold from 32 to 38 metres; 2 metres at 0.87 g/t gold and 1.25% copper from 242 to 244 metres; and 34 metres at 0.34 g/t gold and 0.18% copper from 328 to 362 metres.
- Hole EA19-268 returned 8 metres at 0.97 g/t gold and 1.27% copper from 16 to 24 metres; 16 metres at 0.36 g/t gold and 0.19% copper from 420 to 436 metres; 4 metres at 2.72 g/t gold and 0.25% copper from 550 to 554 metres; 6 metres at 3.35 g/t gold and 0.64% copper from 612 to 618 metres; and 12 metres at 1.15 g/t gold from 638 to 650 metres.
- Hole EA19-267 returned 2 metres at 25.2 g/t gold from 33 to 35 metres; 21 metres at 0.25 gold g/t and 0.24% copper from 98 to 119 metres; 16 metres at 0.39 g/t gold and 0.19% copper from 360 to 376 metres.
Source: https://www.newgold.com/investors/news-releases/news-details/2021/New-Gold-Provides-New-Afton-Exploration-Update/default.aspx
As an integral part of New Gold’s Project Procurement team, the Project Buyer will provide support to the Capital Projects group.
The role of the Major Material Warehouse Technician is responsible for the managing of all the major materials (fuel, oils, mill reagents, tires, drilling materials etc.) to support the mine operations.
The Senior Inventory Management Analyst leads the management of Rainy River Mine Inventory to sustain site operations.
The role of Warehouse Technician is to ensure the efficient operation of all warehouse activities.
As a member of the New Gold Rainy River team, the Lead Environmental Technician demonstrates commitment and compliance with company Health & Safety, Environment and Social Responsibility policies and procedures.
The role of Mine operations Superintendent is to oversee the safe and efficient extraction of ore through the supervision and control of mining department activities such as budgeting, planning staffing and cost control.
The Senior Mine Engineer will provide clarity and focus for the engineering group to achieve and surpass the mine’s safety and production targets and to add value to the operation.
The Engineering & Construction Superintendent is expected to be a safety leader on site and thus will be required to demonstrate experience in executing work with a safety focus and an emphasis on human performance.
Groundwater monitoring, management and modeling is a critical component in Environmental management at New Afton.
Red Seal Industrial Mechanic (Millwright) provides skilled expertise, executing world class maintenance practices and lubrication techniques.