Toulnustouc Hydro Electric Power Project, Northern Quebec
PERI’s “Ready-for-use“ Service Assembly Team: PERI Germany and PERI Toronto PERI GRV system, utilized for the tunnel roof. The formwork employed had to be versatile enough to meet the strict tolerances specified by Hydro Quebec (1/8”, 3 mm) while being able to withstand enormous concrete loads from slabs up to 10’(3.05 m) deep. PERI pre-built these complex elements in the controlled environment of the pre-assembly facility. This enabled not only time and labour savings in assembly and erection requirements at site but also assurance of a high precision finished product. The PERI team of assembly experts prearranged the entire roof form in the assembly hall to assure proper fit for all the elements. The form for the front section of the tunnel was also pre-assembled at PERI’s shop. The form was engineered to be able to be transported to site in complete elements for faster erection on the space restricted site. Increasingly, contractors are demanding pre-assembled and transportable formwork elements such as slab tables, special column formwork, RUNDFLEX elements or customized formwork. At numerous logistics centers, PERI provides this service in state-of-the-art assembly halls. Here, well-trained and highly qualified personnel work with optimally-designed machines and equipment which ensures cost-effective solutions even for the most unusual architectural requests.
Contractor: Aecon Civil, Montreal, Quebec
Source: http://www.peri.ca/en/projects.cfm/fuseaction/showreference/reference_ID/625/referencecategory_ID/20.cfm
A Designer designs cost effective formwork, shoring and scaffolding solutions, and prepares drawings (including material take-offs) for standard designs and, as training and experience allow, custom designs under the supervision of the Engineering Supervisor.
The Regional Manager is responsible for establishing PERI as the largest and most competent player in the formwork market as well as managing the Branch operations to maximize profitability.
To provide exceptional customer service and communication to both internal and external customers while collecting all credit accounts in a timely manner, working toward reducing the DSO and achieving a DSO within the PERI benchmark.