Home > Mining Companies > Alamos Gold Inc > News > Alamos Gold Announces...
Alamos Gold Inc

Alamos Gold Announces Completion of Lower Mine Expansion at Young-Davidson Mine

Jul 8, 2020
TORONTO, July 08, 2020 (GLOBE NEWSWIRE) - Alamos Gold Inc. (TSX:AGI; NYSE:AGI) (“Alamos” or the “Company”) today announced that it has completed the lower mine expansion at Young-Davidson with the successful commissioning of the Northgate shaft.
 
“This marks a significant milestone for Young-Davidson and turning point for Alamos as we transition from a reinvestment phase to a period of strong free cash flow growth. I would like to congratulate the entire team at Young-Davidson for this historic achievement which will unlock the full potential of the operation. With a 13 year mineral reserve life, large resource base, and significant exploration potential, Young-Davidson is well positioned to deliver solid free cash flow over the long term,” said John A. McCluskey, President and Chief Executive Officer. 
 
In addition to the Northgate shaft, the underground crusher and conveyor system have also been successfully commissioned. Mining rates are expected to ramp up through the second half of the year to 7,500 tonnes per day by the end of 2020. This is expected to drive strong free cash flow growth at Young-Davidson and company-wide in the second half of 2020 and beyond.
 
About Alamos
 
Alamos is a Canadian-based intermediate gold producer with diversified production from three operating mines in North America. This includes the Young-Davidson and Island Gold mines in northern Ontario, Canada and the Mulatos mine in Sonora State, Mexico. Additionally, the Company has a significant portfolio of development stage projects in Canada, Mexico, Turkey, and the United States. Alamos employs more than 1,700 people and is committed to the highest standards of sustainable development. The Company’s shares are traded on the TSX and NYSE under the symbol “AGI”.
 
FOR FURTHER INFORMATION, PLEASE CONTACT:
 
Scott K. Parsons
Vice President, Investor Relations
(416) 368-9932 x 5439
 

Source: https://www.alamosgold.com/news-and-events/default.aspx

Development Boomtruck Operator
  • Safely move material as directed. Report and document all material moved accurately to his/her Supervisor;
  • Accurately report to supervisor the material needed in storage areas U/G
Rock Breaker Operator
  • Operate rock-breaker;
  • Perform pre-op and post-op inspections on equipment
Scissordeck Bolter
  • Install ground support as per company standard;
  • Install and maintain services;
  • Load development rounds
Ground Control Engineer
  • QAQC of shotcrete, ground support installation, grouting, ground support auditing and paste fill;
  • Document inspections of underground stoping and development;
  • Rock mass characterisation and classification
Mine Engineer
  • Assist with blast improvement investigations;
  • Look for opportunities to improve efficiencies;
  • Provide guidance to EIT’s
Construction Miner - Transmixer
  • Operate equipment such as transmixer and shotcrete sprayer;
  • Assist in installation, modification and repairs of UG infrastructures
Geological Technician/or Junior Geologist
  • 3D digitizing of underground geological mapping and integration into 3D mining software.
  • Digitize geological surface geological mapping lithology, structure and mineralization
  • Digitize chip sampling of ore development headings as required
Mill Operator/Labourer
  • Works and ensure all workers work in compliance with the Occupational Health & Safety Act, Regulations for Mines and Mining Plants and all other applicable government standards and regulations;
  • Adheres to and enforces all safety and environmental considerations
Document Control Coordinator - Phase III
  • Implement document and data management solutions with a primary focus on workflow, document control, information security and records management.
  • Provide ongoing training and support to end users in the use of the document management system.
  • Ensure project and operations teams comply with the document management requirements and procedures
Project Controls Manager - Phase III
  • Development and implementation of project controls systems and procedures.
  • Working with accounting personnel to ensure accurate reporting and approval of accruals, forecasts, and project status.
  • Early identification and notification of deviations and variances to project baseline schedule and spend