Home > Mining Companies > Wesdome Gold Mines Ltd. > News > EXPLORATION DRILLING AND...
Wesdome Gold Mines Ltd.

EXPLORATION DRILLING AND DEVELOPMENT AT THE EAGLE RIVER MINE CONTINUES TO RETURN HIGH GRADE VALUES FROM 311 WEST AND 300 EAST ZONES

Dec 8, 2020
TORONTO, Dec. 08, 2020 (GLOBE NEWSWIRE) -- Wesdome Gold Mines Ltd. (TSX: WDO) (“Wesdome” or the “Company”) today announces results from the ongoing underground exploration drilling program at the Company’s wholly-owned Eagle River Mine in Wawa, Ontario.
 
300 East Zone
 
Ongoing extension and definition drilling of the 300 East Zone has continued to return high grade gold intersections. The 300 East Zone, previously defined from the 750 m-level to 1,000 m-level, has now been extended to the 1,400 m-level (Figure 1). The down plunge extension is a relatively more tabular zone that now measures in excess of 100 metres (“m”) along strike with above average widths and grades. The recent drilling confirms the continuity of the geometry, and the consistency of the high grade mineralization, and remains open down plunge.
 
Highlights of the recent drilling are found below and are summarized in Table 1.
 
Hole 925-E-135: 41.0 g/t Au over 10.0 m core length (34.8 g/t Au cut, 4.2 m true width)
Hole 925-E-166: 54.9 g/t Au over 10.1 m core length (35.8 g/t Au cut, 5.1 m true width)
Hole 925-E-167: 47.3 g/t Au over 5.9 m core length (29.4 g/t Au cut, 3.0 m true width)
All assays cut to 140.0 g/t Au. True widths are estimated.
 
In addition, limited drilling has intersected a new zone of mineralization approximately 40 m north and in the hanging wall of the high grade 300 East zone. Hole 925-E-172 returned 43.1 g/t Au (29.0 g/t Au capped) over 1.5 m true width. This zone remains open down plunge and along strike and highlights the potential of finding additional sub-parallel zones in this area and will remain a priority throughout 2021. The recent drilling results will be included in the 2020 year end mineral resource and reserve statement.
 
311 West Zone
 
The Company is continuing to develop and explore 311 West Zone along the western margin of the mine diorite. Ongoing development on 750 level and associated sub-levels have defined high grade mineralization over 100 m in strike length (Figure 2). The recent development confirms the continuity of the geometry and the consistency of the high grade mineralization. This development has returned higher gold grades than originally intersected by the exploration drilling. The zone has transitioned from the diorite into the adjacent mafic volcanics, again highlighting the potential of the volcanic rocks to host gold mineralization, similar to that observed at the neighbouring Falcon 7 zone. The 311 West Zone remains open up plunge and along strike to the west within the mafic volcanics, and will be a focus of 2021 drilling.
 
Highlights of the recent development are found below.
 
Sill 750-311 Sub #2: 44.8 g/t Au (27.1 g/t Au capped) striking 134 m over a true thickness of 2.9 m.
Sill 750-311 Sub #1: 42.9 g/t Au (26.8 g/t Au capped) striking 143 m over a true thickness of 2.1 m.
Sill 750-311 Sub #3: 56.7 g/t Au (34.3 g/t Au capped) striking 131 m over a true thickness of 2.0 m.
All assays cut to 60.0 g/t Au.
 
Mr. Duncan Middlemiss, President and CEO commented, "We are thrilled with our ongoing exploration efforts in the 300 East Zone which continue to grow in size and return high grade values. Mining of this zone will positively impact operations for the next several years.”
 
“We are also very pleased with the development of the 311 West zone that confirms the continuity of high grade in this zone, and appears to be even higher grade than the original exploration drilling. The 311 West zone will comprise a significant portion of 2021 mining and is substantially developed in preparation for production, which bodes well for the 2021 plan. Further, the gold mineralization is transitioning into the surrounding mafic volcanics, again proving the likelihood of identifying additional zones in the volcanics with our surface drilling program in 2021.  We are currently in the process of planning next years’ exploration program, the largest in the Company’s history, which will consist of the continuation of exploration at depth, outside of the mine diorite, as well as areas along the Eagle Mine trend throughout our southern property package, with the aim of unlocking additional value on the Eagle River property.”
 
ABOUT WESDOME
 
Wesdome Gold Mines is in its 30th year of continuous gold mining operations in Canada. The Company is 100% Canadian focused with a pipeline of projects in various stages of development. The Eagle River Complex in Wawa, Ontario is currently producing gold from two mines, the Eagle River Underground Mine and the Mishi Open pit, from a central mill. Wesdome is actively exploring its brownfields asset, the Kiena Complex in Val d’Or, Quebec. The Kiena Complex is a fully permitted former mine with a 930 metre shaft and 2,000 tonne per day mill. The Company has further upside at its Moss Lake gold deposit, located 100 kilometres west of Thunder Bay, Ontario, which is being explored and evaluated to be developed in the appropriate gold price environment. The Company has approximately 138.9 million shares issued and outstanding and trades on the Toronto Stock Exchange under the symbol “WDO.”
 

Source: https://www.wesdome.com/news/press-releases/#9afc048899140b81427d65481af1e3ae

IT Analyst

This position is responsible for supporting end-users primarily at our Eagle River Mine Complex.

Junior Accountant

This position is accountable for supporting accounting processes as well as the processing of accounts payable in a manner consistent with established policies and procedures.

Senior Mine Geologist, Eagle River Mine
• Promote safe work practices and safety culture within a production-oriented environment.
• Maintain drill hole databases and monitor underground diamond drill programs.
• Supervise and participate in the selection of underground diamond drill targets.
Surface Maintenance (Hourly)

Ensure that all buildings, and infrastructures on Wesdome property, as well as roads, culverts, & bridges are properly maintained Work in a safe, environmentally friendly, and cost-effective manner.

Heavy Duty Equipment Mechanic

Heavy Equipment Mechanic is responsible, as part of a team, for maintaining the equipment and mechanical systems of the Eagle River Mine site to ensure smooth and continuous operation.

Maintenance Planner
  • Reporting to the Maintenance Projects, Mobile & Mine Fixed Plant Superintendent
  • Ensuring compliance with health and safety and environmental regulations and policies is of primary importance with this position.
Hoist Mechanic/Millwright

Reporting to the Eagle River Maintenance Planner or designate, the successful candidate will perform the maintenance and repairs of all surface, underground stationary equipment, long hole buggies, compressors rock breakers and pumps at the mine site.

Manager – Asset Management & Reliability

Reporting to the Mine General Manager, the Manger of Asset Management & Reliability will be an inspirational and innovative leader responsible and accountable for operational performance excellence in the Asset Management and Reliability Department.

Process Plant Maintenance Millwright (RED SEAL CERTIFCATION REQUIRED)
  • The Millwright is responsible for doing the maintenance of the milling operation equipment.
  • Reports to Lead hand Millwright and Mill General Foreman
Chief Mine Geologist, Eagle River Mine

The Chief Mine Geologist will be responsible and accountable for all work conducted by the Geology Department while ensuring the work is safe, cost effective and makes the most efficient use of manpower and materials.