Home > Mining Companies > Vale S.A. > News > Vale on the West III Project
Vale S.A.

Vale on the West III Project

Oct 9, 2020
Vale informs that its Board of Directors approved the establishment, by its subsidiary Vale International S.A., of a Joint Venture with Ningbo Zhoushan Port Company Limited, a subsidiary of Zhejiang Provincial Seaport Investment & Operation Group Co. Ltd., to build, own and operate the West III Project in Shulanghu Port, Zhoushan City, Zhejiang Province, China.
 
The West III Project consists in expanding the Shulanghu Port facilities, developing a stockyard and loading berths with additional 20 Mtpy capacity. By participating in the Project, Vale will secure a total port capacity of 40Mtpy in Shulanghu, which will help Vale to optimize its overall supply chain costs.
 
The Project has total multiyear investments of RMB 4.3 billion (~US$ 624 million, full equity, 100% basis) and it includes acquisition of land rights and the development of port capacity of 20 Mtpy, including the construction of a new stockyard and two loading berths, subjects to regulatory approvals.
 
Vale will own 50% of the JV and both parties intend to obtain third-party loan of up to 65%, but not less than 50% of the total investment. With these assumptions, Vale's capital contribution to the project will vary between US$ 109 million and US$ 156 million, approximately. The construction of the project, which is expected to take up to three years, will start after both parties obtain the anti-trust and other regulatory approvals in China.
 
The Project secures strategic port capacity for Vale in China, as Shulanghu Port berths Valemaxes and allows Vale's shipping and distribution costs optimization.
 
About the blending strategy
 
In 2015, Vale launched the Brazilian Blend Fines (BRBF), a product resulting from blending fines from Carajas, in the Northern System, with fines from the Southern and Southeastern Systems, which complement each other in terms of physical, chemical and metallurgical characteristics.
 
The BRBF is produced at the Teluk Rubiah Maritime Terminal in Malaysia and at seventeen ports in China, including Shulanghu. This process reduces the time needed to reach Asian markets and increases our distribution capillarity by allowing the use of smaller vessels.
 
The blending strategy also allows more efficient mining plans and increases the use of dry processing methods, which in return reduce capital expenditures, extend the life of our mines and reduce the use of water in our operations: a key flexibility to cope with the short-term challenges
 
About the partner
 
Ningbo Zhoushan Port Company Limited (Stock Code: 601018) is the operator of the public terminals of the Ningbo Zhoushan Port, which has ranked first in the world for 11 consecutive years in terms of total cargo throughput. As one of the largest terminal operators in China, Ningbo Zhoushan Port Company Limited is engaged in the loading and unloading of containers, iron ore, crude oil, coal, liquified oil, grains among other cargos. It owns two berths that can receive 400,000-DWT vessels. The partnership between Vale and Ningbo Zhoushan Port Company Limited has been continuously strengthened over the past years and expanded to many strategic projects.
 

Source: http://www.vale.com/brasil/EN/aboutvale/news/Pages/Vale-on-the-West-III-Project-.aspx

Sr Engineer, Ground Control

We are currently seeking a Senior Engineer, Ground Control to join our Creighton Mine in Sudbury.

Sr Analyst, Business Planning (System 1)

We are currently seeking a Sr Analyst, Business Planning (System 1) to join our Planning & Engineering team in Sudbury. This is a permanent position.

Heavy Duty Equipment Technician

We are currently seeking Heavy Duty Equipment Technicians to join our Maintenance Department in Sudbury.

Engineer-In-Training (EIT)

The successful candidate will be a member of the Vale's Ontario Operations and enrolled in a 48-month program that includes Application of Theory, Practical Experience, Management of Engineering Communication Skills, and Social Implications of Engineering which is the requirement for licensing as a Professional Engineer in Ontario. 

Technical Leader, Projects Sudbury

We are currently seeking a Technical Leader, Projects Sudbury to join our Exploration and Mineral Projects team in Sudbury. This is a permanent position.

Surface Construction Manager

We are currently seeking a Surface Construction Manager to join our Voisey's Bay Mine Expansion Project Team for our remote mine site in Voisey's Bay, Labrador, a fly-in fly-out operation. This project term position will be working from home office with regular travel to Voisey's Bay.

Manager, Exploration Voisey's Bay

We are currently seeking a Voisey's Bay Exploration Manager to join our Exploration team in St. John's and Voisey's Bay Mine site, Newfoundland and Labrador. This is a permanent position.

Manager, Exploration Thompson

We are currently seeking a Manager, Exploration Thompson to join our Exploration team in Thompson. This is a permanent position.

Maintenance Technician - Scaffolding

We are currently seeking a Maintenance Technician - Scaffolder to join our Maintenance Team at our remote mine site in Voisey's Bay, Labrador , a fly-in fly-out operation. This is a permanent position, with a 2 week on, 2 week off rotation.

Human Resources Coordinator (Fixed-Term)

We are currently seeking a Human Resources Coordinator to join our Human Resources team in Sudbury. This is a 12 month fixed-term position.