Home > Wallbridge - Broken Hammer > News > WALLBRIDGE CONTINUES TO...
Wallbridge - Broken Hammer

WALLBRIDGE CONTINUES TO PRODUCE STRONG DRILL RESULTS FROM ITS DEFINITION AND EXPANSION DRILL PROGRAM AT FENELON

May 6, 2021
Toronto, Ontario – May 06, 2021 – Wallbridge Mining Company Limited (TSX:WM) (“Wallbridge” or the “Company”) is pleased to announce that its 2021 definition and expansion drill program on the Fenelon Gold Property (“Fenelon” or the “Property”) continues to confirm the grade and geometry of the central portions of the Tabasco-Cayenne and Area 51 Zones and expand the mineralized footprint.
 
Drilling is currently focusing on various areas within the approximately 1.0 km by 1.2 km central portion of the Fenelon Gold System, in order to collect additional information to expand and better define the mineralization in support of a maiden mineral resource estimate planned for Q3 2021 (Fig. 2). Highlight results from these various areas, released today, include:
 
Tabasco-Cayenne-Contact Zone, Definition Drilling: 8.57 g/t Au over 10.35 metres in FA-21-226-W1 and 16.67 g/t Au over 4.55 metres in FA-21-221-W4, with surrounding assays pending (see Figs. 1, 4 and 6);
Area 51, Definition Drilling (near surface above 250 m vertical depth - potential open pit resource): 3.46 g/t Au over 47.50 metres in FA-21-241(see Figs. 3 and 5);
Area 51, Definition Drilling (below 250 m depth): 284 g/t Au over 0.60 metres in FA-21-226-W1 and 2.09 g/t Au over 24.15 metres in FA-20-215 (see Fig. 5 and 6);
Area 51, Near Surface Southwest Expansion Drilling: 34.99 g/t Au over 5.70 metres, including 351.00 g/t Au over 0.55 metres in FA-20-228 (see Fig. 3);
 
“The results released today are from multiple target areas and contain a mix of the various mineralization types within the Fenelon Gold System,” stated Attila Péntek, Vice President Exploration of Wallbridge. “The Tabasco-Cayenne intersections are filling in larger gaps between previous intersections in the western part of the known extent of these zones and confirm good underground bulk mining potential, whereas Area 51 yields strong intersections of potentially bulk mineable zones both near surface and underground. Our definition drill program at 75-metre drill spacing is progressing well and we are on track to complete this in-fill drilling by the summer, in support of the maiden mineral resource estimate later this year.”
 
“In addition, our expansion drill program focusing on growing the known footprint of near surface Area 51 mineralization in support of the open pit component of our 2021 resource estimate has shown good results. Not only have we intersected strong mineralization hosted inside the Jeremie Diorite, but in certain areas the mineralization also extends into the adjacent sedimentary rocks, as exemplified by the high-grade intersection in hole FA-21-228 reported today.”  
 
 Tabasco-Cayenne-Contact Zones, Definition Drill Results
 
Definition and expansion drilling at a nominal 75-metre drill spacing, targeting the Tabasco-Cayenne-Contact Zones has been focusing on a strike length of approximately 800 metres and vertical depths between 300 and 1,000 metres in order to define the geometry and grade of the zones and gain information on the structural controls on gold mineralization.
 
Highlight intersections from this drill program in the Tabasco-Cayenne-Contact Zones, reported today include:
 
FA-21-226-W1 2.29 g/t Au over 29.40 metres, including
5.85 g/t Au over 8.90 metres in the Contact Zone, and
8.57 g/t Au over 10.35 metres, including
29.94 g/t Au over 2.65 metres in the Tabasco Zone (see Figs. 1, and 4);
FA-21-221-W4 16.67 g/t Au over 4.55 metres in the Tabasco Zones (see Figs. 1 and 6);
Note: Further assay results around this interval are pending
FA-20-215 2.54 g/t Au over 32.50 metres, including
3.87 g/t Au over 9.50 metres, and
3.70 g/t Au over 5.85 metres in the Tabasco Zones (see Figs. 1, and 6);
FA-21-230-W1 2.25 g/t Au over 24.80 metres, including
8.15 g/t Au over 4.40 metres in the Tabasco Zone, and
3.61 g/t Au over 8.80 metres,, including
5.88 g/t Au over 4.20 metres in the Cayenne Zone(see Figs. 1, and 4);
FA-19-094-W3 7.21 g/t Au over 5.05 metres in the Cayenne Zone (see Fig. 1);
 
Area 51 Definition Drill Results
 
As our drill holes approach Tabasco-Cayenne, they also transect the Area 51 gold vein network, thereby collecting crucial information from all of these zones as well.
 
Near surface (down to 250 m vertical depth) highlights from Area 51 zones from the holes reported today include:
 
FA-21-241 3.46 g/t Au over 47.50 metres,, including
52.38 g/t Au over 2.50 metres (see Figs. 3 and 5);
Note: Further assay results around this interval are pending
FA-21-230 0.84 g/t Au over 149.00 metres, including
1.29 g/t Au over 14.10 metres and
141 g/t Au over 0.55 metres (see Figs. 3 and 4);
 
Highlight intersections of Area 51 zones from below 250 m vertical depth reported today include:
 
FA-21-226-W1 284 g/t Au over 0.60 metres (see Fig. 5);
Note: Further assay results around this interval are pending
FA-20-215 2.09 g/t Au over 24.15 metres, including
19.92 g/t Au over 2.00 metres (see Fig. 6);
 
Area 51 Expansion Drill Results
 
In recent weeks, two drill rigs have been focusing on expanding the known footprint of near-surface gold mineralization in the western-southwestern portion of Area 51 in order to grow the open pit resource potential.
 
Highlight intersections from this program reported today include:
 
FA-20-228 34.99 g/t Au over 5.70 metres, including
351.00 g/t Au over 0.55 metres (see Fig. 3);
FA-20-240 1.00 g/t Au over 15.00 metres (see Fig. 3);
FA-20-234 0.72 g/t Au over 34.85 metres (see Fig. 3);
 
2020-2021 Drilling Program Update
 
In 2021, the Company is planning to complete approximately 170,000 metres of drilling, with a maiden mineral resource estimate at Fenelon anticipated in the third quarter of 2021 (see Wallbridge Press Release dated January 11, 2021). Approximately 10-15% of the drill program will be devoted to regional exploration on the Company’s district-scale, underexplored land package on the Detour-Fenelon Gold Trend.
 
Figure 1. Fenelon Gold, Tabasco-Cayenne-Gabbro Zones Long Section
 
 
Figure 2. Fenelon Gold, Plan View
 
 
Figure 3. Fenelon Gold, Zoomed-In Plan View, Surface down to 250 m Depth
 
 
Figure 4. Fenelon Gold, Cross Section 9975_E
 
 
Figure 5. Fenelon Gold, Cross Section 10050_E
 
 
Figure 6. Fenelon Gold, Cross Section 10125_E
 
 
About Wallbridge Mining
 
Wallbridge is currently advancing the exploration and development of its 100%‒owned Fenelon Gold property which is located along the Detour‒Fenelon Gold Trend, an emerging gold belt in northwestern Québec. The Company completed approximately 102,000 metres of drilling in 2020 and has begun a fully‒funded 2021 program of approximately 170,000 metres of drilling and 4,800 metres of underground exploration development (Phase 1 of a 10,000‒metre two‒year program). The Company intends to complete a maiden mineral resource on the Fenelon Gold System in the third quarter of 2021.
 
Wallbridge now holds several kilometres surrounding its rapidly expanding Fenelon discovery providing room for growth, as well as future mine development flexibility. Wallbridge's land holdings in Québec along the Detour‒Fenelon Gold Trend are over 900.0 km2, improving Wallbridge's potential for further discoveries for over 90‒kilometre strike length in this under‒explored belt.
 
Wallbridge is also the operator of, and a 17.8% shareholder in, Lonmin Canada Inc., a privately‒held company with a portfolio of nickel, copper, and platinum‒group metals (PGM) projects in Ontario's Sudbury Basin.
 

Source: https://wallbridgemining.com/news/wallbridge-continues-to-produce-strong-drill-results-from-its-definition-and-expansion-drill-program-at-fenelon/

Supervisor of core shack , Fénélon Project
• Supervise and assist the team of core geological technicians.
• Make sure the team works and meets health and safety standards.
• Complete work cards, timesheets, daily reports and team schedules.
Project Coordinator, Fenelon Project

The Project Coordinator will report directly to the project manager, he/she will be accountable for contractor coordination/supervision on surface and underground along with safe efficient coordination of activities to support the execution of the Fenelon Project requirements.

Mining Technician , Fénélon Project
• Perform surface and subsurface surveys.
• Draw produce and update development plans.
• Perform underground ventilation surveys.
IT Technician (Support IT), Fénélon Project

The technician IT will report to the Project Manager, the schedule is 4/3.