PERI Formwork Systems Inc.

CB Climbing System

• High bearing capacity
The high loading capacity of the brackets allow very large scaffold units. This saves the number anchor points required as well as reducing climbing times.

• Simple moving procedure by crane
Through the strong connection of formwork together with the climbing scaffold, both can be moved as a single climbing unit by crane. Thus valuable time-savings can be achieved.

• Fast striking process without a crane
With the roller-supported carriage, large formwork elements can also be retracted quickly and a minimum of effort.

• No tripping hazards
The decking is positioned on the brackets and level with the carriage which means the area is free of tripping hazards. Thus working safety levels in front of the formwork as well as behind are increased.
The modular system for all kinds of applications
The CB 240 and CB 160 climbing scaffold systems are framework brackets for supporting large-area wall formwork. They guarantee simple handling, fast concreting cycles and problem-free adjustment to different wall configurations.
 
The high bearing capacity of the brackets allows large bracket spacings (and thus large scaffold units) whilst at the same time ensuring very high load assumptions.
 
The climbing formwork is formed by connecting the formwork and climbing scaffold by means of strongbacks which is moved as a complete unit by crane. This means valuable time can be saved.
 
With the CB 240 system, strongbacks are connected to the brackets by means of a carriage complete with rack and adjustable brace. When the wall formwork is retracted, approx. 75 cm of working space is created and provides safe access for cleaning and fixing re-bars. The 2.40 m wide decking is positioned on the brackets and level with the carriage which means the area is free of tripping hazards. Thus working safety levels in front of the formwork as well as behind are increased. The decking can be pre-fabricated and used again on the next construction site.
 
For the CB 160, strongbacks are attached by using an adjusting unit and adjustable brace. The decking is only 1.60 m wide and the formwork is only put into a tilted position.