Dyno Nobel Inc.

NONEL EZ DET 1.1B

NONEL® nonelectric delay detonator EZ DET® units consist of a length of orange shock tube with a surface detonator attached to one end and an in-hole, High Strength, detonator on the other. The surface detonator is inside a color-coded plastic EZ™ Connector block to facilitate easy connections to up to 6 shock tube leads. Easy-to-read, color-coded delay tags display the delay number and nominal firing time prominently.

NONEL EZ DET 1.1B
NONEL® nonelectric delay detonator EZ DET® units consist of a length of orange shock tube with a surface detonator attached to one end and an in-hole, High Strength, detonator on the other. The surface detonator is inside a color-coded plastic EZ™ Connector block to facilitate easy connections to up to 6 shock tube leads. Easy-to-read, color-coded delay tags display the delay number and nominal firing time prominently.
 
NONEL EZ DET units can be easily connected to one another to satisfy basic blast design requirements in construction, mining, and quarry operations. They can also be used in combination with NONEL MS, NONEL EZTL™ and/or NONEL TD detonators to satisfy complex blast design requirements and minimize inventory of initiation system components.
 
APPLICATION RECOMMENDATIONS
 
• For detailed application recommendations, ALWAYS request a copy of Dyno Nobel’s Product Manual: NONEL® and PRIMACORD® from your Dyno Nobel representative.
• ALWAYS select a NONEL EZ DET unit having more than enough tubing length to extend from the planned primer location in the borehole to the collar of the next hole.
• ALWAYS protect the plastic EZ Connector block and all shock tube leads from impact or damage during the loading and stemming operations. Use care when placing blasting mats and cover material on top of the blasting circuit. The EZ Connector block contains a detonator and is subject to detonation caused by abuse such as impact. Shock tube which has been cut, ruptured or damaged may cause misfires.
• ALWAYS be sure that the shock tube(s) are securely inserted, one at a time, into the EZ Connector block. The head of the EZ Connector block should rise to accept the shock tube and return to a closed position with an audible click. 
• ALWAYS ensure that individual shock tubes remain aligned side by side in the connector channel and do not cross one over the another on insertion.
• NEVER use NONEL EZ DET units with detonating cord. The low strength surface detonator will not initiate detonating cord and may cause misfires.
• NEVER attempt to disassemble the delay detonator from the plastic EZ Connector block or use the detonator without the connector.
• NEVER place more than 6 shock tube leads into the plastic EZ Connector block. Misfires may result.
• NEVER pull, stretch, kink or put tension on shock tube such that the tube could break.
• NEVER splice NONEL EZ DET shock tube together to extend between holes.
• NEVER connect NONEL EZ DET units together until all holes have been primed, loaded and stemmed and the blast site has been cleared.
 
TRANSPORTATION, STORAGE AND HANDLING
 
• NONEL EZ Det must be transported, stored, handled and used in conformity with all federal, state, provincial and local laws and regulations.
• For maximum shelf life (3 years), NONEL EZ Det must be stored in a cool, dry, well ventilated magazine. Explosive inventory should be rotated. Avoid using new materials before the old. For recommended good practices in transporting, storing, handling and using this product, see the booklet “Prevention of Accidents in the Use of Explosive Materials” packed inside each case and the Safety Library Publications of the Institute of Makers of Explosives.