Paste Fill Pipe Handling Mining Vehicle PT616
The Titanium PT616 Paste Fill Pipe Handling Mining Vehicle is specifically developed to improve efficiency and safety of installation and removal of 203 mm (8”) diameter paste fill pipes in underground operations. Additionally, it can install 2”, 4” and 6” diameter pipes for other required services. As well, this vehicle can tram from the scissor platform.
On-board diagnostic monitoring to protect key critical systems
Comfortable swivel hydraulic suspension seat, dual armrests and joy-stick control
Easy access for pre-operational checks and servicing
Compartments for operator tool box, lubricant storage, centralized greasing, brake accumulators and batteries
Remote traction and steering control, including stabilizer, start-stop and emergency stop
Hot and cold sides designed for additional safety