Home > Suppliers Companies > Weir Minerals > Products > Tanks > Mathena EcoTank Intelligent System
Weir Minerals

Mathena EcoTank Intelligent System

The Mathena™ Eco-Tank Intelligent System (ECO-ISL) provides more accurate tank volume and level-change analysis of the eco-tank.

Mathena EcoTank Intelligent System
A modular component in the Weir Intelligent System platform, the Mathena™ Eco-Tank Intelligent System (ECO-ISL) provides more accurate tank volume and level-change analysis of the eco-tank or other secondary containment units. This data helps to lower risk and eliminate non-productive time.
 
Reducing environmental impact
The industry’s first active, real-time monitoring system for containment levels, the ECO-ISL is designed to improve safety and reduce environmental impact of overflows by increasing operator-response time, making it ideal for environmentally sensitive areas. Measurements are accessible from both local-panel displays and our Cloud-based customer portal. 
 
Local and remote real-time access
In addition to providing local performance monitoring, the ECO-ISL connects customers with real-time data via text, email, or Cloud-based portal. This data, backed up remotely, can be shared or stored for future reference.
 
Modular and compatible
The ECO-ISL can be deployed as a single product or integrated with multiple Weir IS products, such as the Mathena™ Vent-Gas Analyzer (VGA-ISF). The system also offers integration capability with Pason, MD Totco, and other EDR platforms via WITS communication protocol.
 
Features
Applications include retrofits for undersized MGS units, Class I Div 2 Hazardous Area MGS control, and drilling operations requiring visibility into the MGS operation and well-bore returns
Physical-level and operating system alarms, along with warnings for remote monitoring
Real-time monitoring of fluid carryover from separators
Simplified diagnostics and troubleshooting
Available for rent, with service centers in every basin; fully inspected and recertified after every job
Two-to-four weeks lead time for installation and deployment
 
Processes
Drilling