PERI Formwork Systems Inc.

PERI UP T 70 / T 100

• Guardrail in advance
The guardrail in advance of the next level is assembled together with the T-frame from the lower secured level. The scaffolder is already in a safe position entering the next level. The basis for quick and safe working conditions.

• Open frame
The open frame consists of lightweight, easy to handle components for quick, tireless working, e.g. the T-frame UVT 72/700 weighs only 14.7 kg. In addition, in the field of scaffolding, it is the key to providing the highest safety andbest working conditions.

• Integrated lock against lift off
With the integrated lock against lift off, the deck is secured the moment it is placed and moved sideward. There is no need for additional components. Scaffold decks can easily be removed and replaced even after finishing erecting.

• Inner and outer side protection
The inner standards have the same connection points as the standards on the outside. This means the side protection - consisting of the three elements guardrail, intermediate guardrail and toe board - can be placed on both sides of the deck. There is no extra work installing additional components.
PERI UP T 70 / T 100 Frame scaffolding
Standard assembly of PERI UP takes place from a safe position through the guardrail in advance. Without the need of any additional components, the guardrail for the next level can be mounted or dismantled by one person from a safe position below. When entering the next level, the erector is protected against falling by this guardrail.
 
PERI scaffolding thus fulfils all requirements of the EU Directive concerning the minimum safety and health requirements for the use of work equipment by workers at work – attaching a safety harness as demanded in numerous countries is not necessary with PERI UP.

 
The following versions are available:
 
PERI UP T70
• system width 72 cm, deck width 64 cm
• used as working and safety scaffold in Load Classes 1 to 4 (0.75 – 3.00 kN/m²)
• equipment options for scaffold assembly include inner console bracket, outer console bracket, roof protection, side protection, pavement gantry framework, bridging, nets, tarpaulin
• possible use in jobs whereby smaller quantities of materials and/or components can be stored e.g. painting, cladding work, assembly work
 
PERI UP T100
• system width 104 cm, deck width 96 cm
• used as working and safety scaffold in Load Classes 1 to 4 (0.75 – 6.00 kN/m²)
• equipment options for scaffold assembly include inner console bracket, outer console bracket, roof protection, side protection, pavement gantry framework, bridging, nets, tarpaulin
• possible use in jobs whereby larger quantities of materials and/or components can be stored e.g. masonry work, plastering, assembly work
 
A global product
Our customers receive a scaffold system which fully complies with required proof of stability and working safety. The assembly instructions, which have been translated into many languages, contain the results that are clearly represented throughout.

For the European sector, PERI UP fulfils the requirements placed on a scaffold system according to EN 12810 and EN 12811.