Bonterra intersects 34.5 g/t Au over 2.7 metres at Barry
![](https://news.mininglifeonline.net/sites/default/files/2020-03/Bonterra.jpg)
Bonterra Resources Inc. is pleased to announce the following results from the ongoing drilling campaign at the Barry project. The results include several intersections, including 34.5 g/t Au over 2.7 metres ("m") in hole MB-20-286, 5.4 g/t Au over 2.55 m in hole MB-20-285, 4.5 g/t Au over 1.7 m in hole MB-20-284, and 6.9 g/t Au over 0.8 m in hole MB-20-281.
The 2020 drilling campaign at Barry resumed on July 23, 2020 with two drills in operation, one on a barge on Lake Limpide and the other on dry land near the deposit. Since July 23, 2020, the Company has drilled 37 holes representing a total of 13,002 m of a planned 20,000 m. Results from 19 holes have been received. Results from the remaining 18 drilled holes are pending.
Pascal Hamelin, Interim CEO and VP, Operations commented: "These results are very promising as all drill holes were testing the western extension of the existing resource. The western extension at Barry has been identified by Bonterra as a prospective area to confirm existing inferred resources and add new resources, and the results to date are confirming this view."
Tags: Quebec / Exploration / Gold / All Articles