Delta Drills 15.94 g/t over 10m at Delta-1, in Thunder Bay
"We are extremely pleased with these initial results from our 2024 drill campaign at the Delta 1 Gold deposit in Thunder Bay, Ontario," said André Tessier, President, and CEO. "These results are a great way to start the year at Delta. Once more, the gold zones continue to show continuity and homogeneity. Drill hole D1-24-90 was especially excellent with high grades that are sure to help the economics of the deposit. We look forward to additional results from the current ongoing campaign."
Delta Resources Limited is pleased to provide final assay results for the first four (4) drill holes, and one (1) drill hole extension, from its initial 2024 drill campaign at its 100% owned Delta-1 Gold project. The holes reported total 1,371 metres of a 5,000 metre drill campaign previously announced on January 16, 2024 at the Delta-1 Gold project located 50 km west of Thunder Bay.
The objective of this drill campaign is twofold:
- To fill in gaps from Delta's previous drilling within a mineral envelope already identified within a 2km strike and 250 metre vertical depth to further increase the overall mineral inventory and,
- Exploration drill holes to the east, west and further depths to demonstrate the potential of significantly expanding the mineral envelope.
Highlights:
-
Drill Hole D1-24-90 intersected 15.94 g/t gold over 10.0 metres,
-
Drill Hole D1-24-87 intersected 1.66 g/t over 10.5 metres,
-
Drill Hole D1-24-88 intersected 1.05 g/t over 12.2 metres,
-
Drill Hole D1-24-89 intersected 1.03 g/t over 16.1 metres,
-
Drill Hole D1-24-34ext intersected 1.09 g/t over 21.0 metres.
Tags: Northern Ontario / Exploration / Gold / All Articles