Graycliff Exploration Reports Further High-Grade Gold Results in drilling at Shakespeare
Graycliff Exploration Limited (CSE: GRAY) (OTCQB: GRYCF) (FSE: GE0) (the "Company" or "Graycliff") is pleased to release the next batch of assay results from the Phase Four drilling program at the Shakespeare Gold Project located on the Canadian Shield near Sudbury, Ontario. Phase Four drilling focused on testing the boundaries of the mineralized zone, both along strike and at depth.
Drill Hole J-52 intersected 14.39 grams per tonne of gold ("g/t Au") over 3.0 metres ("m"), including 41.00 g/t Au over 1.0 m. Additionally, J-53 intersected 5.35 g/t Au over 5.0 m, including 21.40 g/t Au over 1.0 m. Significant intervals for Holes J-52 to J-53 are detailed below.
Tags: Northern Ontario / Exploration / Gold / All Articles
September 17, 2024
Metals Creeks provides update on Tillex Copper Project
September 17, 2024
Magna Mining PEA predicts 13-year life for Crean Hill Project
September 17, 2024
Joshua Gold Resources Inc. reports encouraging gold results from Tecumseh
September 16, 2024
Dryden Gold raising $3.5 million
September 17, 2024
Metals Creeks provides update on Tillex Copper Project
September 17, 2024
Joshua Gold Resources Inc. reports encouraging gold results from Tecumseh
September 16, 2024
STLLR Gold intersects 1.10 g/t Au over 74.00 m at Tower Gold Project
September 16, 2024
Magna Mining provides update on exploration at Crean Hill Project
September 17, 2024
Joshua Gold Resources Inc. reports encouraging gold results from Tecumseh
September 16, 2024
Dryden Gold raising $3.5 million
September 16, 2024
GoWest officially gone private - now owned by China
September 16, 2024
Greenridge Exploration to acquire ALX Resources Corp