Home > News > Great Bear Drills Multiple...

Great Bear Drills Multiple Shallow High-Grade Gold Intercepts at LP Fault Including 16.56 g/t Gold Over 11.00 m

Jan 14, 2021


Great Bear Resources Ltd. today reported results from its ongoing $25 million fully funded 2021 exploration program at its 100% owned flagship Dixie Project in the Red Lake district.

This news release provides results from 22 additional LP Fault drill holes over 1.2 kilometres of strike length on 13 drill sections.  Great Bear has now published results from 220 LP Fault drill holes and anticipates up to 400 LP Fault drill holes will be completed by the end of 2021.
The Company also provides new, detailed drill sections in this release, informed by higher-density drilling.

Chris Taylor, President and CEO of Great Bear said, “We recently drilled a test panel of 15 densely spaced holes on 25 – 50 metre centres along 100 metres of strike length at the LP Fault to a depth of over 450 vertical metres.  We were very pleased to observe the same continuity of high-grade and bulk tonnage gold mineralization at the finer scale as we had previously seen with more widely spaced drilling.”



Tags: Northern Ontario / Exploration / Gold / All Articles