Home > News > Metals Creek drills 1.50...

Metals Creek drills 1.50 g/t gold over 18m at Dona Lake

May 18, 2022


Metals Creek Resources Corp. (TSXV: MEK) (OTCQB: MCREF) (FSE: M1C1) (the "Company" or Metals Creek) is pleased to announce additional diamond drill results from drill hole DL22-028 of the phase III diamond drill program at the Dona Lake Gold project (See News Release November 08, 2021).

Results from drill hole DL22-028 continue to define gold mineralization within main zone, south of the mine workings as well as intercepting mineralization within B-Zone at the past producing Dona Lake Gold mine. This hole targeted main zone stratigraphy outside the currently defined mineralized envelope, extending gold mineralization an additional 30m south within the deeper portion of the mineralized iron formation (See Figure 1, Schematic Long Section and Figure 2, Schematic X-Section) This hole intersected the Main Zone stratigraphy 424 meters below surface and returned a core length intercept of 2.56 grammes per ton(g/t) gold (Au) over 6.14 meters(m) ( 464.61 - 470.75m). This was a part of a broader zone of mineralization of 1.50 g/t Au over 18.00m (458.00 - 476.00m). A second zone of mineralization was intercepted (B-Zone) 473m below surface, which returned a core length intercept of 2.05 g/t Au over 9.11m, included in this is 8.88 g/t Au over 1.45m (See Table 1 Significant Results, Figure 2 Schematic X-section). Mineralization within the main zone intercept is hosted within silicate-sulfide iron formation and characterized by stringer to locally disseminated pyrrhotite ranging from 1 to 5% with local pyrite. Magnetite rich sections with local pyrrhotite stringers are locally present. The B-Zone intercept is characterized by trace to 15% disseminated to stringer pyrrhotite with minor pyrite. B-Zone has seen limited drilling historically and represents a prospective target that remains open at depth.

This phase III diamond drill program has successfully defined additional high-grade gold mineralization south of the Dona Lake mine workings. Deeper drilling targeting Main Zone stratigraphy below the lowermost mine workings has further extended high grade gold mineralization down plunge to a vertical depth of 753m (See news release April 5, 2022) from recently reported drill hole DL22-025 returning a high-grade down hole intercept of 8.11 g/t over 9.51m. This hole represents the deepest hole to date on the Dona Lake property with gold mineralization remaining open at depth.

Image removed.

Figure 1 Schematic Longitudinal

To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/943/124342_553a0883242d1b3d_002full.jpg

Image removed.
Figure 2 Schematic Cross-section



Tags: Northern Ontario / Exploration / Gold / All Articles