Home > News > Metals Creek drills 2.64...

Metals Creek drills 2.64 g/t gold over 27.9m at Dona Lake

Apr 26, 2022


Metals Creek Resources Corp. (TSXV: MEK) (OTCQB: MCREF) (FSE: M1C1) (the "Company" or Metals Creek) is pleased to announce additional diamond drill results for drill hole DL22-027 from the phase III diamond drill program at the Dona Lake Gold project (See News Release November 08, 2021).

Results from drill hole DL22-027 continue to further define high grade gold mineralization south of the mine workings at the past producing Dona Lake Gold mine. This hole intersected the Main Zone stratigraphy 368 meters below surface and returned a core length intercept of 5.18 grammes per ton(g/t) gold (Au) over 5.33 meters(m) (403.45 - 408.78m). This was a part of a broader zone of mineralization of 2.64 g/t Au over 27.90m (399.95 - 427.85m). (See Table 1 Significant Results, figure 1 Schematic Longitudinal and figure 2 schematic x section). Mineralization is hosted within silicate-sulfide iron formation and characterized by stringer to locally disseminated pyrrhotite ranging from 1 to 4% with local pyrite. Magnetite rich sections with local pyrrhotite stringers are also present. Aside from pyrrhotite mineralization, alteration consists of strong hornblende and grunerite with local garnet alteration. 

This phase III diamond drill program has successfully defined additional high-grade gold mineralization south of the Dona Lake mine workings. Deeper drilling targeting Main Zone stratigraphy below the lowermost mine workings has further extended high grade gold mineralization down plunge to a vertical depth of 753m (See news release April 5, 2022) from recently reported drill hole DL22-025 returning a high-grade down hole intercept of 8.11 g/t over 9.51m. This hole represents the deepest hole to date on the Dona Lake property with gold mineralization remaining open at depth.

Assays are pending for 4 drill holes at Dona Lake, results will be released once they are received and compiled. In addition, assays from Ogden drilling will be released once they are received and complied.

The Dona Lake Gold Project was optioned from Newmont Corporation (previously Newmont Goldcorp - see news release dated 13 June 2019) and is located in the Pickle Lake Greenstone Belt which is host to several historic mines including the Dona Lake mine, the Central Patricia mine and the Pickle Crow mine. Dona Lake is accessible by an all-weather road southeast from the Town of Pickle Lake. The Project consists of 32 patented and leased mining claims and 35 map staked claims totaling approximately 1,122 hectares and covers the past producing Dona Lake Mine.



Tags: Northern Ontario / Exploration / Gold / All Articles