Home > News > O3 Mining intersects 383.4...

O3 Mining intersects 383.4 g/t Au over 2.0m including 1,510 g/t Au over 0.5m at Marban

Nov 25, 2020


O3 Mining Inc. is providing new drilling results from the Marban Project in Val-d'Or, as part of its 150,000 metre drilling program. "Gold Hawk is shaping up to be a very promising potential high-grade satellite deposit for the Marban mine development project, just 2 kilometres away. The high-grade intercepts confirm the exceptional high-grade characteristic of the gold deposits along the prolific Marbenite shear corridor giving us the confidence to continue the drill program to more quickly unlock its potential and build resources there," said president and CEO Jose Vizquerra.

Current drilling on the Malartic property is focused on expanding mineralization outside of the proposed pit areas (outlined in the Marban Preliminary Economic Assessment "PEA" released September 8th, 2020) and identifying high-grade oreshoots. The 2020-2021 drilling program includes 45,000 metres for the Malarticproperty to test extensions along strike and down plunge of the deposits and zones outside of these areas.

New assay results from seven drill holes drilled down plunge at the Gold Hawk zone include:

Drilling Highlights:

  • 383.4 g/t Au over 2.0 metres in hole O3MA-20-008, including 1,510 g/t Au over 0.5 metres
  • 1.8 g/t Au over 5.0 metres in hole O3MA-20-002
  • 16.8 g/t Au over 0.5 metres in hole O3MA-20-003

 



Tags: Quebec / Exploration / Gold / All Articles