TESC Contracting Company Ltd.

SNC LAVALIN/VALE CANADA LTD. Project

Jul 13, 2020
 
NO. 10 CONVERTER INSTALLATION, CLEAN AER PROJECT – COPPER CLIFF, ON
 
The general scope of work for this contract package covers the installation of Converter No. 10, which includes miscellaneous steel (platforms, grating, stairs and handrails), mechanical equipment, off-gas flues ductwork, piping, valves, electrical and instrumentation equipment, cabling, cable trays, terminations of all wiring, and testing.   The project also requires setting all equipment to their final position & location. TESC is currently completing this project as sub-contractor, adhering to a safe and an effective methodology, and presenting the deliverables on schedule.
 

Source: https://tesc.com/project/no-10-converter-installation-clean-aer-project-copper-cliff-on/

Junior Estimator
The Junior Estimator performs take-offs from construction drawings and calculates the costs of labour and material for
construction projects in accordance with established processes and procedures.
Scheduler/Planner

The Scheduler/Planner oversees and manages every aspect of a project schedule, at every stage from conception to completion. 

Junior Estimator, Electrical
The Junior Estimator performs take-offs from construction drawings and calculates the costs of labour and material for
electrical construction projects in accordance with established processes and procedures.
Project Manager
Reporting to the Division Manager, the Project Manager oversees and manages every aspect of a project cycle, at every
stage from start to completion.