Toronto, Ontario – May 12, 2021 – Wallbridge Mining Company Limited (TSX:WM) (“Wallbridge” or the “Company”) is pleased to provide an update of its exploration and development activities at the Fenelon Gold Property (“Fenelon” or the “Property”), corporate initiatives and planned spending.
 
Maiden Resource Estimate (“MRE”)
 
The Company expects to deliver the Maiden Resource Estimate (“MRE”) on the newly discovered zones (Area 51, Tabasco, and Cayenne) and the Gabbro zones by the end of the third quarter of 2021 as scheduled. The MRE is expected to include both a near-surface and an underground component for all these zones.
 
Surface Exploration Program
 
Drilling
 
Wallbridge is conducting a 170,000-metre drill program in 2021, of which 70,000 metres is planned to be completed by early July 2021, in support of the MRE.  A total of 33,962 metres has been drilled as of March 31, 2021.
 
The decision to use directional drilling to control hole deviation, which is slower but optimizes drill hole spacing and meterage for the MRE in the Tabasco, Cayenne and Area 51 zones, means the rate of drilling in the first quarter was lower than the projected 2021 quarterly average.  The Company expects to make up any shortfall in metreage during the second half of the year as the resource focused directional drilling gives way to resource expansion drilling and regional exploration.
 
Assays
 
Assay turn-around time (“TAT”) has increased by 25% to 35% over the past few months, primarily due to COVID-related restrictions at the assay labs. The Company has now engaged the services of three laboratories, and does not expect the increase in TAT to adversely affect the timing of the MRE.
 
Most of the holes drilled at Fenelon intersect multiple gold mineralized zones (Area 51, Tabasco, Cayenne and Gabbro). On average, 70% of core is within mineralized envelopes and is therefore sent for sampling and assaying. For clarity, the Company generally announces the assay results for holes once the assays for the entire hole have been received. Delays in the receipt of assays within a hole, either due to unexpected high grades or the processing sequence used by the labs, can cause delays in reporting the assays from the entire hole.
 
Underground Exploration
 
In January 2021, Wallbridge announced a 10,000-metre underground exploration development program to create exploration platforms that will allow for more tightly-spaced and deeper drilling in the Area 51, Tabasco and Cayenne zones to further de-risk the project. The 2021 portion of the two-year program was budgeted at approximately 4,800 metres with two crews operating simultaneously on development of exploration platforms in each of the Area 51 and Tabasco zones.
 
Management has since optimized the development schedule and productivities and will continue this program with one development crew rather than two. As a result, the Area 51 development will be completed prior to starting the Tabasco ramp and the expected underground development will be reduced to 2,500 metres, with a corresponding decrease in expenditures, during 2021.
 
Permits
 
As disclosed on January 11, 2021, due to the increased size and scope of the project, the Company has paused the permitting process for a small-scale gold operation in the Gabbro Zone. The Company is now focussing its efforts on submitting permit applications, supported by an updated project description and environmental and social impact assessment, for a much larger and more appropriately sized operation following the delivery of the MRE and associated economic studies.
 
Planned Spending
 
At March 31, 2021, cash and equivalents totaled approximately $71 million, and in April 2021 the Company took advantage of an opportunity to complete a flow-through financing for gross proceeds of $20 million (net $18.5 million) at a 58% premium ($0.95) to the then market price of the stock thereby minimizing dilution. Surface, underground exploration and corporate overhead expenditures for the balance of the year based on the revised underground exploration plan discussed above  are expected to be approximately $55 million, leaving the Company financed into 2022..
 
Regional Exploration
 
The 2021 exploration program includes regional drilling and fieldwork in the second half of the year. This exploration will amount to 10-15 % of the budget and will include approximately 20,000 metres of drilling to test for gold mineralization on various properties within the Company’s large regional land package which includes the Martiniere, Grasset and Casault target areas.
 
At Martiniere, the Company is planning to evaluate the resource expansion potential of the Martiniere West and Bug deposits, which have a combined historical indicated resource of 7,919,598 t @ 2.32 g/t Au for 590,642 oz and have seen very limited drilling below 350 metres vertical depth. The geology and gold mineralization of these deposits are currently being reviewed internally and an updated 43-101 resource estimate is expected to be prepared along with the Fenelon MRE in Q3 2021. In addition, a number of high-priority grassroots gold targets exist elsewhere on the Martiniere property which may be prioritized for drill testing in 2021.  
 
At Grasset, the Company is planning to follow up on historic intersections in the Grasset Gold showing (1.66 g/t Au over 33.00 metres, including 6.15 g/t Au over 4.04 metres) and elsewhere along the Grasset Ultramafic Complex where assays grading up to 216 g/t Au over 0.78 metres have been returned.
 
Nickel-Copper-PGE Assets
 
Wallbridge entered into an operatorship agreement (the “Operatorship Agreement”) with Lonmin Plc (now Sibanye Stillwater) on October 29, 2019 to operate the privately-owned Lonmin Canada (“Loncan”) in return for a 20% ownership interest in Loncan (now diluted to 17.8% due to Loncan equity financing, that Wallbridge chose not to participate in). The decision to proceed with the Operatorship Agreement provided Wallbridge with an interest in an advanced stage property that was complementary to Wallbridge’s own suite of Nickel-Copper-PGE assets. The opportunity, once the Denison Property was closer to production, was to use this project as leverage to advance the Company’s Nickel-Copper-PGE assets  either through joint ventures, partnerships, and/or spin outs. Economic evaluation of the Denison Property is currently underway.
 
With its acquisition of Balmoral Resources Ltd. in May 2020, Wallbridge added several Nickel-Copper-PGE  assets in Ontario and Quebec including the Grasset property with its Nickel-PGM resource. As a result, management now believes that it is in the best interest of its shareholders to assess its current Nickel-Copper-PGE assets with Grasset as the most advanced project. Wallbridge is currently reviewing a number of alternative structures to unlock the value of its Nickel-Copper-PGE assets, including joint ventures, partnerships, spin-outs or outright sales, and will provide an update when available.
 
About Wallbridge Mining
 
Wallbridge is currently advancing the exploration and development of its 100%-owned Fenelon Gold Property which is located along the Detour-Fenelon Gold Trend, an emerging gold belt in northwestern Québec. The Company completed approximately 102,000 metres of drilling in 2020 and has begun a fully-funded 2021 program of approximately 170,000 metres of drilling and 2,500 metres of underground exploration development (Phase 1 of a 10,000-metre program). The Company intends to complete a maiden mineral resource on the Fenelon Gold System in the third quarter of 2021.
 
Wallbridge now holds several kilometres surrounding its rapidly expanding Fenelon discovery providing room for growth, as well as future mine development flexibility. Wallbridge's land holdings in Québec along the Detour-Fenelon Gold Trend are over 900.0 km2, improving Wallbridge's potential for further discoveries for over 90-kilometre strike length in this under-explored belt.
 
Wallbridge is also the operator of, and a 17.8% shareholder in, Lonmin Canada Inc., a privately-held company with a portfolio of nickel, copper, and platinum-group metals (PGM) projects in Ontario's Sudbury Basin.
 
For further information please visit the Company's website at www.wallbridgemining.com or contact:
 
Wallbridge Mining Company Limited
 
Marz Kord, P. Eng., M. Sc., MBA
President & CEO
Tel: (705) 682-9297 ext. 251
Email: mkord@wallbridgemining.com
 
Victoria Vargas, B.Sc. (Hon.) Economics, MBA
Investor Relations Advisor
Email: vvargas@wallbridgemining.com
 

Source: https://wallbridgemining.com/news/wallbridge-provides-corporate-update/

Supervisor of core shack , Fénélon Project
• Supervise and assist the team of core geological technicians.
• Make sure the team works and meets health and safety standards.
• Complete work cards, timesheets, daily reports and team schedules.
Project Coordinator, Fenelon Project

The Project Coordinator will report directly to the project manager, he/she will be accountable for contractor coordination/supervision on surface and underground along with safe efficient coordination of activities to support the execution of the Fenelon Project requirements.

Mining Technician , Fénélon Project
• Perform surface and subsurface surveys.
• Draw produce and update development plans.
• Perform underground ventilation surveys.
IT Technician (Support IT), Fénélon Project

The technician IT will report to the Project Manager, the schedule is 4/3.