Home > Suppliers Companies > ROCK-TECH > Products > > Paste Fill Pipe Handling Mining Vehicle PT616
ROCK-TECH

Paste Fill Pipe Handling Mining Vehicle PT616

 The Titanium PT616 Paste Fill Pipe Handling Mining Vehicle is specifically developed to improve efficiency and safety of installation and removal of 203 mm (8”) diameter paste fill pipes in underground operations. Additionally, it can install 2”, 4” and 6” diameter pipes for other required services. As well, this vehicle can tram from the scissor platform.

PT616
More information Characteristic Data

 

  On-board diagnostic monitoring to protect key critical systems

 

 

 

 

   Comfortable swivel hydraulic suspension seat, dual armrests and joy-stick control

 

 

 

 

  Easy access for pre-operational checks and servicing

 

 

 

 

Compartments for operator tool box, lubricant storage, centralized greasing, brake accumulators and batteries

 

 

 

 

 Remote traction and steering control, including stabilizer, start-stop and emergency stop

 

 

 

 

 

Hot and cold sides designed for additional safety