Lassing Dibben Consulting

Studies

Oct 21, 2013

Lassing Dibben is often called upon to come up with a number of concepts at the initial stage of a project and the related estimated costs for each.  After selection of the preferred concept, a more thorough cost estimate can be performed.  Often this leads to the preparation of design drawings and specifications which are used for the construction phase of the project.  Many of our completed projects originally started out as feasibility studies.


Source: http://www.lassingdibben.com/projects/studies/

Magazine
No information