Landing a plane on ice is something only a handful of pilots will do in their careers. Creating a safe runway for those pilots is something only a few firms have the knowledge and skill to execute safely. Tetra Tech is a leader in the field.
 
Newmont Mining Corporation counts on Tetra Tech’s expertise to design an air strip on a frozen lake, which will provide safe landings for more than 40 flights during the five month winter season.
 
Newmont’s Hope Bay Project sits in a remote location 190 kilometers north of the Arctic Circle in Canada. Access by air provides a lifeline for twice weekly crew changes and the supply of equipment and consumables.
 
Tetra Tech provided ice engineering expertise to design and implement a 2,400 meter long runway on frozen Doris Lake at Hope Bay. The lake ice had to be thickened artificially by 90 centimeters (35.4 inches) in order to land a Boeing 737 on it.
 
This project supports Newmont’s focus on maintaining the highest safety standards at Hope Bay. Numerous calculations, weeks of ice-thickening and monitoring, and a detailed risk review ensured the safety and stability of the air strip. As an additional safety feature, this project implements the first ever GPS approach to an ice strip.
 
In addition, Tetra Tech’s success in getting the air strip ready early saved the client money in using the air strip rather than transshipping smaller loads.
 
Services
• Developing project-specific guidelines that enabled the client to use ice cover more effectively as a working platform
• Analyzing ice carrying capacity to calculate ice thickness for safely supporting jets and Hercules aircraft
• Developing site-specific safety procedures for working on thin ice, which were incorporated into the client’s Standard Operating Procedures
• Providing training sessions on ice safety to on-site personnel
• Collecting ice thickness and shallow bathymetry data using Ground Penetrating Radar (GPR)
• Profiling from the ice bathymetry using GPR, which identifies shoals to anticipate problem areas for heavy traffic, and collecting water volume data to comply with water withdrawal regulations stipulated by the Department of Fishery and Oceans Canada
• Measuring in-situ ice strength to verify that built flood ice is comparable to natural lake ice
• Developing a detailed plan of action for the construction of a 2,400 meter ice runway and completing the work earlier in the season than had been done in the past, translating into substantial savings for the client
 
Services provided include:
• Developed a real-time ice profiling system to measure ice and snow thicknesses and water bathymetry that addressed measurement errors due to varying snow conditions
• Developed a database system containing historic field data that enables more effective planning.

Source: http://www.tetratech.com/projects/hope-bay-ice-airstrip.html

Compressor Project Manager
  • Provide engineering support work to pipeline, compressor stations, launchers, receivers, dehydration stations, pump and regulator station upgrades, and all other piping projects
  • Ensuring project schedule, budget, and quality objectives are achieved for all assigned projects
Senior Contaminated Sites Specialist - Vancouver

You will join a group of scientists and engineers focused on providing high quality deliverables and innovation solutions to our clients.

Piping Designer

This position joins a piping team that provides comprehensive multi-discipline design and engineering service to assist our heavy industrial clients in maintaining and upgrading their facilities, capital and maintenance, for single and multi-discipline engineering design projects.